Contacts

Send Us a Message

Background Image:

Art Heiser, the owner of Aspen ArtWorks, was the Project Manager responsible for the building of the structures and the final working designs for The Big Zips... for the Boy Scouts of America in 2012.

Shown here with this image is the cable anchor arch system with multiple additional imbedded rock anchors, deep below the footer pile cap securing the two way racing zip launch platform and the 10 zip lines to the mountain.  5 zip lines to the left and 5 zip lines to the right, both directly over the main Summit gathering amphitheater.

Click below for more info...

2013 Boy Scout Jamboree, Zip Lines over Summit Amphitheater, (view from top of Left Landing Tower)
2013 Boy Scout Jamboree, Zip Lines over Summit Amphitheater, (view from top of Left Landing Tower)
Left Landing Tower
Left Landing Tower
Right Landing Tower
Right Landing Tower

Contacts

Send Us a Message

Background Image:

Art Heiser, the owner of Aspen ArtWorks, was the Project Manager responsible for the building of the structures and the final working designs for The Big Zips... for the Boy Scouts of America in 2012.

Shown here with this image is the cable anchor arch system with multiple additional imbedded rock anchors, deep below the footer pile cap securing the two way racing zip launch platform and the 10 zip lines to the mountain.  5 zip lines to the left and 5 zip lines to the right, both directly over the main Summit gathering amphitheater.

Click below for more info...

2013 Boy Scout Jamboree, Zip Lines over Summit Amphitheater, (view from top of Left Landing Tower)
2013 Boy Scout Jamboree, Zip Lines over Summit Amphitheater, (view from top of Left Landing Tower)
Left Landing Tower
Left Landing Tower
Right Landing Tower
Right Landing Tower